Procedure BEING BETTER ALL THE WAY

Procedure

Production dept

Production line:

Large- scale injection machine: 45 unites (biggest :4500 tons)
Medium- scale injection machine: 30 unites
Centre supply system
ABB Robot assembling line: 3
ABB Robot painting: 23 unites

BRANSON Ultrasonic welder: 2 unites
Hot melt adhesive welding: 2 unites
Micro compounder machine: 2 unites

Development dept

NC process office:

5-axis machining : 5 unites
CNC EDM machine: 4 unites
Gantry-type Milling Machine: 4 unites
TIG welders: 2 unites
Vertical milling machine: 4 unites
Milling machine: 6 unites
Lathe: 2 unites

CAD/CAM:

High speed process CAM POWERMILL software
3D CAD POWERSHAPE software
UG11 3D software
3D SCANNERS laser scanning system

The vertical integration manufacture process

To meet the various demand for the market, Heng Fu manages completed process from mold development, injection, painting, chroming to package and delivery.

By Informatization system, safety stock for each item is precisely calculated in order to make good use of our storage cost. In quality control, each of our products is directly fitted by cars to make sure we have perfect quality. Documental organized and data analyzed help us foresee and avoid any possible problem.

  • 01
    Material
  • 02
    Supplying material Computer
  • 03
    Injection
  • 04
    Fill PU
  • 05
    Assembly Line
  • 06
    Paint
  • 07
    Package
  • 08
    Stock
  • 09
    Selling
  • 10
    Finish

Overview of the development process

Molds which are available to supply is almost thousands of sets. In order to create a basic parameter, we use high-tech precision reverse technology and obtain the original digital code of the product through 3D laser scanning, then analyze the data by CAD module diagram and finally visualization all the results.

The acquiring of big data is using feedback of PARTING LINE through CAM module computer system, so as to improve the quality, apply and save effectively.

CONTACT